Project Description
Redevelopment of the Kakabeka Falls GS will consist of the following upgrades to the station:
- Maintenance of the existing powerhouse in its original location, with the addition of a new powerhouse “extension” located immediately upstream of the existing powerhouse.
- Removal of the four existing turbine generation units and ancillary equipment.
- Within the new powerhouse, installation of two new Francis type turbines.
- A new powerhouse crane to bused for installation and future maintenance of the equipment.
- Replace existing surge tank building.
- Remove the four existing four penstocks and replace with two new penstocks.
- No work is proposed at the intake structure but gate controls may be modified.
- To accommodate the interconnection between the aqueduct and the new surge tank the demolition of existing concrete transition from the aqueduct to the existing surge tank is required. Then a new section of aqueduct or new transition structure between downstream end of existing aqueduct and new surge tank will be constructed.
PROJECT DESCRIPTION DOCUMENT